After the purchase

House construction

From the plot to commissioning. One contract and one person accountable.

  • Estimate after inspection
  • Design and permits
  • Commissioning

A house is not made of walls but of a sequence: plot, design, permits, foundations, shell, roof, services, finishes, commissioning. Breaking that order gets expensive fast: foundations poured for the wrong design cannot be reworked.

We run the build from checking the plot to commissioning the house. The costing is prepared before work starts and split into stages, each signed off separately.

What is included

What is included

Plot checks: designated use, restrictions, utility connections
House design, or working to your design
Handling the permit process
Foundations, walls, roof
Services: water, drainage, electrics, heating
External and internal finishes to the costing
Commissioning and the documents for the house

Process

How it works

  1. 01
    Plot
    We check the documents and restrictions before any money goes into a design.
  2. 02
    Design
    Ours or yours. The design sets the costing, so it comes first.
  3. 03
    Permits
    We prepare and submit the documents. The timeline depends on the authorities and is outside our control, so we quote a range.
  4. 04
    Construction
    In stages, each signed off: foundations, shell, roof, services, finishes.
  5. 05
    Handover
    Commissioning, technical passport, registration of title.
The exact sum appears after the design, not before.

Prices

Pricing

Indicative; the exact price is set once we know the property.

House to shell and core
as costed
Term: from 6 months
Order
Turnkey house
as costed
Term: from 10 months
Order
House design
as costed
Term: 3-6 weeks
Order
Plot check before purchase
by estimate after an inspection
Term: 3-5 working days
Order
Handling the permit process
as costed
Term: depends on the authorities
Order

Documents

Documents

  • Plot documents and the cadastral number
  • Extract on designated land use
  • Planning conditions, if already obtained
  • Your design, if you have one

FAKTOR

Why FAKTOR

10
years on the market
8 872
listings in our database
7
offices in Odesa

Questions

Frequently asked questions

What does a turnkey house cost?

The price is set by a costing: the gap between a simple and a complex design reaches a factor of two, so no figure can be given before the design exists. The costing is itemised, and it is what becomes the price in the contract.

How long does building take?

From six months to shell and from ten turnkey. Weather and the permit process can move the date, and the schedule allows for that.

Can you build to my design?

Yes. We review the design first: it sometimes contains decisions that add cost for no benefit.

Do you handle permits?

We prepare and submit the documents. The decision rests with the authorities, so we cannot promise a date for it.

What about a plot with no utilities?

Connections are costed separately and can exceed part of the house. That is checked before buying the plot, not after.

Do you guarantee the house?

We guarantee the work we carry out. The term and conditions are fixed in the contract.

Order house construction
Leave your name and phone, we will call back and suggest the next step.
Or write to us on Telegram
New listings on Telegram New properties daily, no spam

For sale now: 8 872 We are online