Modern residential complex with superb on site amenities in beautiful Oba
Completion - 2025
About the complex
A modern residential complex with luxurious internal infrastructure in the beautiful Oba area, where the atmosphere of a quiet southern town with its unhurried life reigns.
The project includes 4 blocks of 6 floors each.
Not far from the Alanium shopping center project, the city hospital, the new Alanya City Hall and the Metro, which makes the apartments in this project profitable and liquid. The area of the land plot is 6,668 m2.
Infrastructure of the complex:
• Outdoor and indoor pools
• Children's swimming pool
• Cinema
• Jacuzzi
• Fitness
• Sauna
• Hamam
• steam room
• Aquapark
• gazebos
• B-B-Q
• Billiards
• Outdoor playground
• Generator
There are 2 blocks for sale:
A block
• 12 apartments 1+1 (53 m2)
• apartments 2+1 (74 m2)
B block
• 4 apartments 2+1D (102-116 m2)
• 2 apartments 4+1D (150-172 m2)
The apartments are rented out in a high-quality fine finish with equipped bathrooms and a built-in kitchen set. First installment 30%, then installments in equal installments until the end of construction on May 30, 2025.
The start of construction is scheduled for June 30, 2023. The project will be handed over on May 31, 2025.
Information updated: 15.08.2025
, , To the sea: 2.3 km To the centre: 6 km To the airport: 42 km Layouts: 1 bedroom, 2 bedrooms, 4+1 penthouse Type: Apartments Market: primary Furniture: Partly Options: Balcony/ Terrace, 0% installment, Elevator Category: From the developer
Purchase terms
Location
Offers in this complex
Leave a request and we will select options to match your needs.
Similar developments
All new developments
For you
How we will help you
- Search by budget and districtWe send options that are actually on sale today.
- Viewings with an agentThe agent goes with you and shows the property on site.
- Document checks and support to registrationWe take the deal from the deposit to the notary and registration of title.
- Valuation and sale of your propertyWe suggest a price based on similar listings and handle the viewings.
FAQ
Frequently asked questions
What is the completion date for Oba Modern?
The building was completed in 2025.
Is there a generator?
Yes, the complex has a generator.
Is there parking?
Yes, the complex has surface parking.
What does the complex have?
The complex has a gym and a pool, gated grounds, security and CCTV and a playground.
