Investment project near the international airport, Tarsus district residential complex
Completion - 2024
About the complex
A modern residential complex is being built in Mersin on an area of 30,000 M2. In the complex, 20,000 m2 will be allocated for infrastructure and 10,000 m2 for a retail area.
The project on a plot of land with an area of 41,080 M2 will consist of 7 blocks. Each block has 15 floors:
• Block A has 312 apartments, of which 237 are 1+1 apartments and 75 are 2+1 apartments. • Block B has 312 apartments, of which 237 are 1+1 apartments and 75 are 2+1 apartments.
Start of construction:10.10.2022
Completion of construction:
• PARIS (A BLOK) AND TOKYO (B BLOK) WILL END ON 10/10/2024. • OTHER UNITS AND COMPLETION OF CONSTRUCTION 10.10.2025.
Infrastructure:
• Outdoor swimming pool
• Open and closed parking
• Outdoor playground
• gazebos
• Basketball court
• Indoor sports hall
Territory features:
• decorative pool
• Cafes and restaurants
• walking area
• gazebos
• Open and closed outlets
Location:
• to the beach - 10km (10 minutes)
• to the airport, 7km (10 minutes)
• to the shopping center "TARSU" - 20m. (1 minutes)
General characteristics:
• Natural gas system
• Heat-resistant pumice is used
• Smart elevator system
• Internal fire detector
• Complete Generator
Internal features:
• Suspended ceiling
• kitchen cabinets
• Wardrobe in the hallway
• Bathroom closet
• kitchen worktop
• steel front door
• Double-glazed windows for PVC windows
• Imported silicone based paint
• Plumbing 1st class
• Shower cabin 1st class
• Laminate 10 mm thick
• glass balcony railings
Information updated: 17.07.2025
, , To the sea: 10 km To the airport: 7 km Layouts: 1 bedroom, 2 bedrooms Type: Apartments Market: primary Furniture: Partly Options: Balcony/ Terrace, 0% installment, Elevator Category: From the developer
Purchase terms
Location
Offers in this complex
Leave a request and we will select options to match your needs.
For you
How we will help you
- Search by budget and districtWe send options that are actually on sale today.
- Viewings with an agentThe agent goes with you and shows the property on site.
- Document checks and support to registrationWe take the deal from the deposit to the notary and registration of title.
- Valuation and sale of your propertyWe suggest a price based on similar listings and handle the viewings.
FAQ
Frequently asked questions
What is the completion date for Tarsus Investment Residence?
The building was completed in 2024.
Is there a generator?
Yes, the complex has a generator.
Is there parking?
Yes, the complex has surface parking.
What does the complex have?
The complex has a gym and a pool, gated grounds and a playground.
