Apartments under construction in a complex in Oba
Completion - 2024
About the complex
Located in the popular Oba district with developed infrastructure, a large number of public gardens and parks. The residential complex consists of 5 blocks of 5-story buildings with apartments ranging from 57-175 m2. The area of land where this project will be built is 8000 m2. The windows offer a beautiful view of the pool and the infrastructure of the complex.
Distance to:
• sea 1400 meters
• airport 42 km
• Alanya center 4 km
Infrastructure:
• pool
• sauna
• steam room
• hamam
• jacuzzi
• barbecue area
• garden
• alcove
If you prefer a more active pastime, you can play table tennis, billiards, or visit the gym.
The residential complex has indoor and outdoor parking, security, a concierge, and video surveillance - nothing threatens your safety. Each house has a lobby, an elevator, and the apartments have heated floors and a smart home system.
• Apartment 1+1 -57-60 m2
• Apartment 2+1 -93-115 m2
• Apartment 3+1 -125 m2
• Apartment 4+1-175 m2
• Apartment 5+1-173 m2
Start of construction: 15.11.2022 Completion of construction: 15.11.2024
Information updated: 14.08.2025
, , To the sea: 1.4 km To the centre: 4 km To the airport: 42 km Layouts: 1 bedroom, 2 bedrooms, 3 bedrooms, 4 bedrooms, 5 bedrooms Type: Apartments Market: primary Furniture: Partly Options: Smart house, Warm floor, Balcony/ Terrace, 0% installment, Elevator Category: From the developer
Purchase terms
Location
Turkey, Alanya, Oba
Offers in this complex
Leave a request and we will select options to match your needs.
Similar developments
All new developments
For you
How we will help you
- Search by budget and districtWe send options that are actually on sale today.
- Viewings with an agentThe agent goes with you and shows the property on site.
- Document checks and support to registrationWe take the deal from the deposit to the notary and registration of title.
- Valuation and sale of your propertyWe suggest a price based on similar listings and handle the viewings.
FAQ
Frequently asked questions
What is the completion date for Oba New Build?
The building was completed in 2024.
Is there a generator?
Yes, the complex has a generator.
Is there parking?
Yes, the complex has surface parking.
What does the complex have?
The complex has a gym and a pool, gated grounds, security and CCTV and a playground.
